SEIA FOR GOLD MINING (PHASE 1) AT MOUNT WULLERSDORF, TAWAU

Special Environmental Impact Assessment (SEIA) For “Proposed Gold Mining (Phase 1) On Cl.105651438 At Mount Wullersdorf, Tawau, Sabah By Southsea Gold Sdn Bhd.”

Panel Review

List of Review Panel – Terms Of Reference (Tor) Of The Special Environmental Impact Assessment (Seia) For “Proposed Gold Mining (Phase 1) On Cl.105651438 At Mount Wullersdorf, Tawau, Sabah By Southsea Gold Sdn Bhd.”

Setiausaha Tetap
Kementerian Pelancongan, Kebudayaan & Alam Sekitar
Tingkat 5-7, Blok A, Wisma Tun Fuad Stephens
88300 KOTA KINABALU

Setiausaha Hasil Bumi
Pejabat Hasil Bumi
Jabatan Ketua Menteri, Tingkat 18, Blok A, Pusat Pentadbiran Negeri Sabah, Jalan Sulaman, Teluk Likas
88400 KOTA KINABALU

Ketua Konservator Hutan
Jabatan Perhutanan Sabah
Beg Berkunci No.68
90009 SANDAKAN

Pengarah
Jabatan Tanah Dan Ukur
Beg Berkunci 2044
88576 KOTA KINABALU

Pengarah
Jabatan Mineral Dan Geosains
Jalan Penampang
88999 KOTA KINABALU

Pengarah
Taman Taman Sabah
Lot 45 & 46, 1-5 Floor
Block H, Signature Office
KK Times Square, Coastal Highway
88100 KOTA KINABALU

Pengarah
Jabatan Hidupan Liar
Tingkat 5, Block B, Wisma MUIS 88100 KOTA KINABALU

Pengarah
Jabatan Kesihatan Negeri Sabah
Rumah Persekutuan, Jalan Mat Salleh
88590 KOTA KINABALU

Pengarah
Jabatan Pengairan dan Saliran
Aras 5, Blok B, Wisma Pertanian 88632 KOTA KINABALU

Pengarah
Jabatan Kerja Raya
Jalan Sembulan
886582 KOTA KINABALU

Pengarah
Jabatan Perikanan
Aras 4, Blok B, Wisma Pertanian 88632 KOTA KINABALU

Pengarah
Jabatan Air Negeri Sabah
Tingkat 6, Blok A, Wisma MUIS
88825 KOTA KINABALU

Pengarah
Jabatan Alam Sekitar
Aras 4, Blok A
Kompleks Pentadbiran Kerajaan Persekutuan Sabah,
Jalan UMS – Sulaman, Likas
88450 KOTA KINABALU

Pesuruhjaya Polis Sabah
Ibu Pejabat Polis Kontinjen Sabah
Polis Diraja Malaysia
88560 KOTA KINABALU

Presiden
Majlis Perbandaran Tawau
Peti Surat No. 412
91007 TAWAU

Pegawai Perhutanan
Pejabat Perhutanan Daerah Kunak
Peti Surat 2
91207 KUNAK

Penolong Pemungut Hasil Tanah
Penolong Pejabat Pemungut Hasil Tanah
DAERAH TAWAU

Jurutera
Jabatan Pengairan dan Saliran
Peti Surat 549
91008 TAWAU

Jurutera
Jabatan Kerja Raya
Peti Surat 200
Mile 4 Apas Road
91007 TAWAU

Dekan (Prof. Madya Dr. Justin Sentian)
Fakulti Sains Dan Sumber Alam
Universiti Malaysia Sabah
Beg Berkunci 2073
88999 KOTA KINABALU

Dekan
Fakulti Kejuruteraan
Universiti Malaysia Sabah
Beg Berkunci 2073
88999 KOTA KINABALU

Dekan (Dr. Gaim @ James Lunkapis)
Fakulti Kemanusiaan, Seni dan Warisan
Universiti Malaysia Sabah
Beg Berkunci 2073
88999 KOTA KINABALU

Chief Technical Officer
Worldwide Fund For Nature (WWF)
Suite 1-6-W11, 6th Floor
CPS Tower, No. 1, Jalan Centre Point
88000 KOTA KINABALU

Presiden
Sabah Environmental Protection Association
8A, F13, Tingkat 8, Blok A, Kompleks Karamunsing
88300 KOTA KINABALU

Draft Term of Reference

Draft Terms Of Reference (TOR) Of The Special Environmental Impact Assessment (SEIA) For “Proposed Gold Mining (Phase 1) On Cl.105651438 At Mount Wullersdorf, Tawau, Sabah By Southsea Gold Sdn Bhd.”

This is to inform the public that the Environment Protection Department is in the process of reviewing the draft Terms of Reference [“TOR”] of the Special Environmental Impact Assessment (SEIA) report for the “Proposed Gold Mining (Phase 1) on CL.105651438 at Mount Wullersdorf, Tawau, Sabah by Southsea Gold Sdn Bhd.”

Members of the Public are invited to give their written comments on the draft TOR of the SEIA report from 22nd September 2015 to 23rd October 2015. 

Please click on the PDF icon to view the relevant document. Acrobat Reader needed to read PDF file);

Kindly provide your comments on the draft Terms of Reference to email : jpas@sabah.gov.my before 23rd October 2015.

Director
 Jabatan Perlindungan Alam Sekitar (Environment Protection Department)
 3rd Floor, Wisma Budaya
Jalan Tunku Abdul Rahman, Locked Bag 2078
 88999 Kota Kinabalu, Sabah.
 Tel No. : 088-251290, 251291, 267572, 268572
Fax No. : 088-238120
 e-mail: jpas@sabah.gov.my

Summary of Public Comments

Not available

Final Terms of Reference

(Approved on 28 October 2015)

Draft Special EIA-Report

SEIA Report of THE SPECIAL ENVIRONMENTAL IMPACT ASSESSMENT (SEIA) FOR “THE PROPOSED GOLD MINING (PHASE 1) ON CL.105651438 AT MOUNT WULLERSDORF, TAWAU, SABAH”

This is to inform the public that the Environment Protection Department is in the process of reviewing the Special Environmental Impact Assessment (SEIA) Report for “The Proposed Gold Mining (Phase 1) on CL.105651438 at Mount Wullersdorf, Tawau, Sabah”.

Members of the Public are invited to give their written comments on the SEIA report from 25th October 2016 to 05th December 2016.

Please click on the PDF icon to view the relevant document. Acrobat Reader needed to read PDF file); 

Written comments must be sent by mail or e-mail before 05th December 2016 to:

Director
 Jabatan Perlindungan Alam Sekitar
(Environment Protection Department)
  3rd Floor, Wisma Budaya
 Jalan Tunku Abdul Rahman
  Locked Bag 2078
 88999 KOTA KINABALU
 Tel No. : 088-251290, 251291, 267572, 268572
Fax No. : 088-238120
 e-mail: jpas@sabah.gov.my

Final Special-EIA Report

(Approved on 13 March 2017)