Plate 1: Flagpole used to mark the mineable area.
Plate 2: Example of marking on the excavator’s arm to ensure extraction does not exceed the allowable depth.
Plate 3: Levelling staff as indicated by the arrow.
Plate 4: Example of suction pump cable with clamp.
Plate 5: Marking of boundary using wooden stake painted with red and white.
Plate 6: Marking of boundary with zinc hoarding.
Plate 10: Sedimentation pond (pointed)
Plate 11: Debris tank (shown with arrow).
Plate 12: Water sprinkler facility along the access road.
Plate 14: Dust suppression systems at screening facility.
Plate 16: Zinc hoarding.
Plate 17: Example of oil storage equipped with drip pan for barge or pontoon.
Plate 21: Example of washing facility (sprinkler system).