Skip to content
Home
Introduction
Overview
Guided SOP
BACK
Sensitive Or Protected Area
HOME
/
ISOMETRIC MAP
/
SENSITIVE OR PROTECTED AREA
/ OPERATION
5.0 MANAGEMENT AND DISPOSAL OF OVERBURDEN
6.0 MANAGEMENT AND EXTRACTION IF BORROW PIT AREA
7.0 CONTROL OF NOISE AND OPERATION TIMES
8.0 CONTROL OF AIR QUALITY
12.0 CONTROL OF TRAFFIC AND TRANSPORTATION
13.0 CONTROL OF BLASTING, FLY ROCK AND VIBRATION
Home
Introduction
Overview
Guided SOP