3.0 ENVIRONMENTAL CONDITION: CONSTRUCTION OF SITE FACILITY
3.1 Preparation of Site Facilities (Workers’ Quarters, Workshop and Site Office).
3.1.1 Identify the location of facilities based on the mitigation measures map in the AEC.
3.1.2 Conduct minimal site clearing and earthwork on areas designated for the establishment of site facilities.
3.2 Drainage System
3.2.1 Workers’ Quarters
3.2.1.1 Provide an effective drainage system at the workers’ quarters.
3.2.1.2 Conduct weekly maintenance to ensure no blockages in the drainage system.
3.2.2 Workshop
3.2.2.1 Construct workshop with an effective drainage system.
3.2.2.2 Conduct weekly maintenance to ensure no blockages in the drainage system.
3.3 Location of Site Facilities
3.3.1 Workers’ Quarters
3.3.1.1 Establish workers’ quarters at a minimum horizontal distance of 30 metres away from the top of the bank (of the nearest river or watercourse) or distance specified in the AEC / MD.
3.3.2 Workshop
3.3.2.1 Establish workshop at a minimum horizontal distance of 50 metres away from the top of the bank (of the nearest river or watercourse) or distance specified in the AEC / MD.