{"id":5351,"date":"2023-07-03T17:51:44","date_gmt":"2023-07-03T09:51:44","guid":{"rendered":"http:\/\/localhost\/virsopv2\/?page_id=5351"},"modified":"2023-07-05T16:45:38","modified_gmt":"2023-07-05T08:45:38","slug":"site-preparation-hydraulic-2-0-processing-and-stockpile-area","status":"publish","type":"page","link":"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation-hydraulic-pontoon\/site-preparation-hydraulic-2-0-processing-and-stockpile-area\/","title":{"rendered":"Site Preparation: Hydraulic \u2013\u00a02.0 Processing and Stockpile Area"},"content":{"rendered":"\n\t<section class=\"section\" id=\"section_1168081823\">\n\t\t<div class=\"bg section-bg fill bg-fill bg-loaded bg-loaded\" >\n\n\t\t\t\n\t\t\t\n\t\t\t\n\n\t\t<\/div>\n\n\t\t\n\n\t\t<div class=\"section-content relative\">\n\t\t\t\n\n<div class=\"row align-right\"  id=\"row-420780240\">\n\n\n\t<div id=\"col-508804982\" class=\"col small-12 large-12\"  >\n\t\t\t\t<div class=\"col-inner\"  >\n\t\t\t\n\t\t\t\n\n<p style=\"text-align: right;\">\t\t\t<!-- Flexy Breadcrumb -->\r\n\t\t\t<div class=\"fbc fbc-page\">\r\n\r\n\t\t\t\t<!-- Breadcrumb wrapper -->\r\n\t\t\t\t<div class=\"fbc-wrap\">\r\n\r\n\t\t\t\t\t<!-- Ordered list-->\r\n\t\t\t\t\t<ol class=\"fbc-items\" itemscope itemtype=\"https:\/\/schema.org\/BreadcrumbList\">\r\n\t\t\t\t\t\t            <li itemprop=\"itemListElement\" itemscope itemtype=\"https:\/\/schema.org\/ListItem\">\r\n                <span itemprop=\"name\">\r\n                    <!-- Home Link -->\r\n                    <a itemprop=\"item\" href=\"https:\/\/epd.sabah.gov.my\/virsopv2\/\">\r\n                    \r\n                                                    <i class=\"fa fa-home\" aria-hidden=\"true\"><\/i>                    <\/a>\r\n                <\/span>\r\n                <meta itemprop=\"position\" content=\"1\" \/><!-- Meta Position-->\r\n             <\/li><li><span class=\"fbc-separator\">\/<\/span><\/li><li class=\"active\" itemprop=\"itemListElement\" itemscope itemtype=\"https:\/\/schema.org\/ListItem\"><span itemprop=\"name\" title=\"Site Preparation: Hydraulic \u2013\u00a02.0 Processing and Stockpile Area\">Site Preparation: Hydraulic \u2013\u00a02.0 Processing and Stockpile Area<\/span><meta itemprop=\"position\" content=\"2\" \/><\/li>\t\t\t\t\t<\/ol>\r\n\t\t\t\t\t<div class=\"clearfix\"><\/div>\r\n\t\t\t\t<\/div>\r\n\t\t\t<\/div>\r\n\t\t\t\n\n\t\t<\/div>\n\t\t\t\t\n<style>\n#col-508804982 > .col-inner {\n  padding: 0px 11px 0px 0px;\n}\n<\/style>\n\t<\/div>\n\n\t\n\n<\/div>\n\n\t\t<\/div>\n\n\t\t\n<style>\n#section_1168081823 {\n  padding-top: 30px;\n  padding-bottom: 30px;\n}\n#section_1168081823 .ux-shape-divider--top svg {\n  height: 150px;\n  --divider-top-width: 100%;\n}\n#section_1168081823 .ux-shape-divider--bottom svg {\n  height: 150px;\n  --divider-width: 100%;\n}\n<\/style>\n\t<\/section>\n\t\n\t<section class=\"section\" id=\"section_2065882844\">\n\t\t<div class=\"bg section-bg fill bg-fill bg-loaded bg-loaded\" >\n\n\t\t\t\n\t\t\t\n\t\t\t\n\n\t\t<\/div>\n\n\t\t\n\n\t\t<div class=\"section-content relative\">\n\t\t\t\n\n<h1 class=\"uppercase\" style=\"text-align: center;\"><span style=\"font-size: 120%; color: #416a59;\">CONTROL OF PROCESSING &amp; STOCKPILE AREA<\/span><\/h1>\n<p>&nbsp;<\/p>\n<p><strong>Establishment of processing and stockpile areas at unsuitable or prohibited locations cause adverse environmental impacts in terms of potential water pollution as well as disturbance to riparian habitats.<\/strong><\/p>\n<div class=\"row\"  id=\"row-377797390\">\n\n\n\t<div id=\"col-29500364\" class=\"col medium-2 small-12 large-2\"  >\n\t\t\t\t<div class=\"col-inner\"  >\n\t\t\t\n\t\t\t\n\n<h3>Target:<\/h3>\n\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\n\t\n\n\t<div id=\"col-678345466\" class=\"col medium-10 small-12 large-10\"  >\n\t\t\t\t<div class=\"col-inner\"  >\n\t\t\t\n\t\t\t\n\n<p>Protection of water quality and riparian habitat by controlling activities at processing and stockpile areas.<\/p>\n\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\n\t\n\n<\/div>\n<div class=\"row\"  id=\"row-1010472453\">\n\n\n\t<div id=\"col-82728076\" class=\"col sop_div medium-2 small-12 large-2\"  >\n\t\t\t\t<div class=\"col-inner\"  >\n\t\t\t\n\t\t\t\n\n\t<div id=\"text-668593974\" class=\"text\">\n\t\t\n\n<h3>Standard Operating Procedures<\/h3>\n\t\t\n<style>\n#text-668593974 {\n  font-size: 1.2rem;\n}\n<\/style>\n\t<\/div>\n\t\n<a class=\"button primary is-small expand expand_all_btn\"  >\n  <i class=\"icon-expand\" ><\/i>  <span>Expand All<\/span>\n  <\/a>\n\n\n\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\n\t\n\n\t<div id=\"col-363061403\" class=\"col medium-10 small-12 large-10\"  >\n\t\t\t\t<div class=\"col-inner\"  >\n\t\t\t\n\t\t\t\n\n<div class=\"accordion\" rel=\"\">\n\n<div class=\"accordion-item\"><a href=\"#\" class=\"accordion-title plain\"><button class=\"toggle\" aria-label=\"Toggle\"><i class=\"icon-angle-down\"><\/i><\/button><span>2.1 Project Signboard<\/span><\/a><div class=\"accordion-inner\">\n\n\t<div id=\"text-215344578\" class=\"text t-justify\">\n\t\t\n\n<p><strong>2.1.1<\/strong> Erect a project signboard at the site entrance with size 5 m x 2.0 m. The project signboard shall consist of the following information:<\/p>\n<ul>\n<li style=\"list-style-type: none;\">\n<ul>\n<li>Operator\u2019s name<\/li>\n<li>Address<\/li>\n<li>Telephone number<\/li>\n<li>TOL approval or title number and validity of license<\/li>\n<li>Reference number and date of EIA Approval Letter<\/li>\n<li>Validity of EIA approval<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><strong>2.1.2<\/strong> Install a warning signboard at the site entrance or erect a warning signboard at the location shown in the figure of the AEC to warn the public against trespassing in the processing area.<\/p>\n<p><strong>2.1.3<\/strong> Apply wayleave from the Public Works Department (PWD) for the erection of the project signboard located at the road reserve.<\/p>\n\t\t\n<style>\n#text-215344578 {\n  font-size: 0.95rem;\n}\n<\/style>\n\t<\/div>\n\t\n\n<\/div><\/div>\n<div class=\"accordion-item\"><a href=\"#\" class=\"accordion-title plain\"><button class=\"toggle\" aria-label=\"Toggle\"><i class=\"icon-angle-down\"><\/i><\/button><span>2.2 Site Boundary<\/span><\/a><div class=\"accordion-inner\">\n\n\t<div id=\"text-2429783622\" class=\"text t-justify\">\n\t\t\n\n<p><strong>2.2.1 <\/strong>Mark all corners of the processing site boundary using sturdy materials at visible locations and as specified in the Boundary marking tools that can be used include painted wood stakes, signboards and zinc hoarding.<\/p>\n\t\t\n<style>\n#text-2429783622 {\n  font-size: 0.95rem;\n}\n<\/style>\n\t<\/div>\n\t\n<div class=\"row\"  id=\"row-368873883\">\n\n\n\t<div id=\"col-429114704\" class=\"col medium-6 small-12 large-6\"  >\n\t\t\t\t<div class=\"col-inner\"  >\n\t\t\t\n\t\t\t\n\n\t<div class=\"box has-hover   has-hover box-text-bottom\" >\n\n\t\t<div class=\"box-image\" style=\"width:90%;\">\n\t\t\t\t\t\t<div class=\"\" >\n\t\t\t\t<img width=\"482\" height=\"321\" src=\"https:\/\/epd.sabah.gov.my\/virsopv2\/wp-content\/uploads\/2023\/05\/20.jpg\" class=\"attachment- size-\" alt=\"\" decoding=\"async\" loading=\"lazy\" \/>\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\n\t\t<div class=\"box-text text-center\" >\n\t\t\t<div class=\"box-text-inner\">\n\t\t\t\t\n\n\t<div id=\"text-1692144535\" class=\"text\">\n\t\t\n\n<p><strong>Plate 5: <\/strong>Marking of boundary using wooden stake painted with red and white.<\/p>\n\t\t\n<style>\n#text-1692144535 {\n  font-size: 0.9rem;\n}\n<\/style>\n\t<\/div>\n\t\n\n\t\t\t<\/div>\n\t\t<\/div>\n\t<\/div>\n\t\n\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\n\t\n\n\t<div id=\"col-921436824\" class=\"col medium-6 small-12 large-6\"  >\n\t\t\t\t<div class=\"col-inner\"  >\n\t\t\t\n\t\t\t\n\n\t<div class=\"box has-hover   has-hover box-text-bottom\" >\n\n\t\t<div class=\"box-image\" style=\"width:90%;\">\n\t\t\t\t\t\t<div class=\"\" >\n\t\t\t\t<img width=\"855\" height=\"570\" src=\"https:\/\/epd.sabah.gov.my\/virsopv2\/wp-content\/uploads\/2023\/05\/21.jpg\" class=\"attachment- size-\" alt=\"\" decoding=\"async\" loading=\"lazy\" srcset=\"https:\/\/epd.sabah.gov.my\/virsopv2\/wp-content\/uploads\/2023\/05\/21.jpg 855w, https:\/\/epd.sabah.gov.my\/virsopv2\/wp-content\/uploads\/2023\/05\/21-600x400.jpg 600w, https:\/\/epd.sabah.gov.my\/virsopv2\/wp-content\/uploads\/2023\/05\/21-768x512.jpg 768w\" sizes=\"(max-width: 855px) 100vw, 855px\" \/>\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\n\t\t<div class=\"box-text text-center\" >\n\t\t\t<div class=\"box-text-inner\">\n\t\t\t\t\n\n\t<div id=\"text-2846457733\" class=\"text\">\n\t\t\n\n<p><strong>Plate 6: <\/strong>Marking of boundary with zinc hoarding.<\/p>\n\t\t\n<style>\n#text-2846457733 {\n  font-size: 0.9rem;\n}\n<\/style>\n\t<\/div>\n\t\n\n\t\t\t<\/div>\n\t\t<\/div>\n\t<\/div>\n\t\n\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\n\t\n\n<\/div>\n\n<\/div><\/div>\n<div class=\"accordion-item\"><a href=\"#\" class=\"accordion-title plain\"><button class=\"toggle\" aria-label=\"Toggle\"><i class=\"icon-angle-down\"><\/i><\/button><span>2.3 Buffer Boundary<\/span><\/a><div class=\"accordion-inner\">\n\n\t<div id=\"text-4039904955\" class=\"text t-justify\">\n\t\t\n\n<p><strong>2.3.1 <\/strong>Mark the buffer boundary at locations indicated in the AEC before the commencement of any project activities with visible boundary markers made from sturdy Boundary markers that can be used include painted wooden stakes, signboards or PVC pipes.<\/p>\n<p><strong>2.3.2 <\/strong>Provide buffer based on the width stated in the AEC.<\/p>\n<p><strong>2.3.3 <\/strong>Use different buffer boundary markers from the site boundary For example, use red-painted wooden stakes to mark the site boundary and yellow-painted wooden stakes to mark the setback or buffer areas boundary.<\/p>\n<p><strong>2.3.4<\/strong> Prohibit any activities within the buffer area.<\/p>\n\t\t\n<style>\n#text-4039904955 {\n  font-size: 0.95rem;\n}\n<\/style>\n\t<\/div>\n\t\n\t<div class=\"box has-hover   has-hover box-text-bottom\" >\n\n\t\t<div class=\"box-image\" style=\"width:80%;\">\n\t\t\t\t\t\t<div class=\"\" >\n\t\t\t\t<img width=\"1280\" height=\"720\" src=\"https:\/\/epd.sabah.gov.my\/virsopv2\/wp-content\/uploads\/2023\/05\/22.jpg\" class=\"attachment- size-\" alt=\"\" decoding=\"async\" loading=\"lazy\" srcset=\"https:\/\/epd.sabah.gov.my\/virsopv2\/wp-content\/uploads\/2023\/05\/22.jpg 1280w, https:\/\/epd.sabah.gov.my\/virsopv2\/wp-content\/uploads\/2023\/05\/22-711x400.jpg 711w, https:\/\/epd.sabah.gov.my\/virsopv2\/wp-content\/uploads\/2023\/05\/22-768x432.jpg 768w\" sizes=\"(max-width: 1280px) 100vw, 1280px\" \/>\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\n\t\t<div class=\"box-text text-center\" >\n\t\t\t<div class=\"box-text-inner\">\n\t\t\t\t\n\n\t<div id=\"text-1666295263\" class=\"text\">\n\t\t\n\n<p><strong>Figure 7: <\/strong>Illustration showing site boundary marking and buffer for sensitive or protected areas.<\/p>\n\t\t\n<style>\n#text-1666295263 {\n  font-size: 0.9rem;\n}\n<\/style>\n\t<\/div>\n\t\n\n\t\t\t<\/div>\n\t\t<\/div>\n\t<\/div>\n\t\n\n<\/div><\/div>\n<div class=\"accordion-item\"><a href=\"#\" class=\"accordion-title plain\"><button class=\"toggle\" aria-label=\"Toggle\"><i class=\"icon-angle-down\"><\/i><\/button><span>2.4 Markers Maintenance<\/span><\/a><div class=\"accordion-inner\">\n\n\t<div id=\"text-1646353358\" class=\"text t-justify\">\n\t\t\n\n<p><strong>2.4.1 <\/strong>Inspect or monitor the marking tools for site and buffer boundaries Conduct maintenance or repair when necessary.<\/p>\n<p><strong>2.4.2<\/strong> All workers must be made aware of the site and buffer boundaries marking tools erected\/installed on-site to prevent them from being removed or damaged.<\/p>\n<p><strong>2.4.3<\/strong> Prohibit all processing activities outside the processing boundary.<\/p>\n\t\t\n<style>\n#text-1646353358 {\n  font-size: 0.95rem;\n}\n<\/style>\n\t<\/div>\n\t\n\n<\/div><\/div>\n<div class=\"accordion-item\"><a href=\"#\" class=\"accordion-title plain\"><button class=\"toggle\" aria-label=\"Toggle\"><i class=\"icon-angle-down\"><\/i><\/button><span>2.5 Processing Site Facilities<\/span><\/a><div class=\"accordion-inner\">\n\n\t<div id=\"text-190348933\" class=\"text t-justify\">\n\t\t\n\n<p><strong>2.5.1<\/strong> Identify the location of the site facilities based on the mitigation map in the AEC.<\/p>\n<p><strong>2.5.2<\/strong> Conduct minimal vegetation removal for the area designated for the establishment of site facilities.<\/p>\n<p><strong>2.5.3<\/strong> Establish site facilities (e.g., workers\u2019 quarters, stockpile, crusher plant, sand screening plant) at a minimum horizontal distance of 30 metres away from the top of the bank (of the nearest river or watercourse) or distance specified in the AEC.<\/p>\n<p><strong>2.5.4<\/strong> Established workshop at a minimum horizontal distance of 50 metres away from the top of the bank (of the nearest river or watercourse) or distance specified in the AEC.<\/p>\n\t\t\n<style>\n#text-190348933 {\n  font-size: 0.95rem;\n}\n<\/style>\n\t<\/div>\n\t\n\n<\/div><\/div>\n<div class=\"accordion-item\"><a href=\"#\" class=\"accordion-title plain\"><button class=\"toggle\" aria-label=\"Toggle\"><i class=\"icon-angle-down\"><\/i><\/button><span>2.6 Processing Site Located with Forest Reserve<\/span><\/a><div class=\"accordion-inner\">\n\n\t<div id=\"text-331348956\" class=\"text t-justify\">\n\t\t\n\n<p><strong>2.6.1<\/strong> Apply for Occupational Permit (OP) from the Sabah Forestry Department (SFD) before the commencement of processing.<\/p>\n\t\t\n<style>\n#text-331348956 {\n  font-size: 0.95rem;\n}\n<\/style>\n\t<\/div>\n\t\n\n<\/div><\/div>\n\n<\/div>\n\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\n\t\n\n<\/div>\n\n\t\t<\/div>\n\n\t\t\n<style>\n#section_2065882844 {\n  padding-top: 30px;\n  padding-bottom: 30px;\n}\n#section_2065882844 .ux-shape-divider--top svg {\n  height: 150px;\n  --divider-top-width: 100%;\n}\n#section_2065882844 .ux-shape-divider--bottom svg {\n  height: 150px;\n  --divider-width: 100%;\n}\n<\/style>\n\t<\/section>\n\t\n\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":0,"parent":5313,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v21.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\r\n<title>Site Preparation: Hydraulic \u2013\u00a02.0 Processing and Stockpile Area - Interactive Isometric Map<\/title>\r\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\r\n<link rel=\"canonical\" href=\"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation-hydraulic-pontoon\/site-preparation-hydraulic-2-0-processing-and-stockpile-area\/\" \/>\r\n<meta property=\"og:locale\" content=\"en_US\" \/>\r\n<meta property=\"og:type\" content=\"article\" \/>\r\n<meta property=\"og:title\" content=\"Site Preparation: Hydraulic \u2013\u00a02.0 Processing and Stockpile Area - Interactive Isometric Map\" \/>\r\n<meta property=\"og:url\" content=\"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation-hydraulic-pontoon\/site-preparation-hydraulic-2-0-processing-and-stockpile-area\/\" \/>\r\n<meta property=\"og:site_name\" content=\"Interactive Isometric Map\" \/>\r\n<meta property=\"article:modified_time\" content=\"2023-07-05T08:45:38+00:00\" \/>\r\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\r\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\r\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation-hydraulic-pontoon\/site-preparation-hydraulic-2-0-processing-and-stockpile-area\/\",\"url\":\"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation-hydraulic-pontoon\/site-preparation-hydraulic-2-0-processing-and-stockpile-area\/\",\"name\":\"Site Preparation: Hydraulic \u2013\u00a02.0 Processing and Stockpile Area - Interactive Isometric Map\",\"isPartOf\":{\"@id\":\"https:\/\/epd.sabah.gov.my\/virsopv2\/#website\"},\"datePublished\":\"2023-07-03T09:51:44+00:00\",\"dateModified\":\"2023-07-05T08:45:38+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation-hydraulic-pontoon\/site-preparation-hydraulic-2-0-processing-and-stockpile-area\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation-hydraulic-pontoon\/site-preparation-hydraulic-2-0-processing-and-stockpile-area\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation-hydraulic-pontoon\/site-preparation-hydraulic-2-0-processing-and-stockpile-area\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/epd.sabah.gov.my\/virsopv2\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Site Preparation\",\"item\":\"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Hydraulic (Pontoon)\",\"item\":\"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation-hydraulic-pontoon\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Site Preparation: Hydraulic \u2013\u00a02.0 Processing and Stockpile Area\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/epd.sabah.gov.my\/virsopv2\/#website\",\"url\":\"https:\/\/epd.sabah.gov.my\/virsopv2\/\",\"name\":\"EPD Interactive SOP\",\"description\":\"Environmental Protection Department Sabah\",\"publisher\":{\"@id\":\"https:\/\/epd.sabah.gov.my\/virsopv2\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/epd.sabah.gov.my\/virsopv2\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/epd.sabah.gov.my\/virsopv2\/#organization\",\"name\":\"Environment Protection Department\",\"url\":\"https:\/\/epd.sabah.gov.my\/virsopv2\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/epd.sabah.gov.my\/virsopv2\/#\/schema\/logo\/image\/\",\"url\":\"http:\/\/localhost\/virsopv2\/wp-content\/uploads\/2022\/10\/cropped-epd-logo.jpeg\",\"contentUrl\":\"http:\/\/localhost\/virsopv2\/wp-content\/uploads\/2022\/10\/cropped-epd-logo.jpeg\",\"width\":512,\"height\":512,\"caption\":\"Environment Protection Department\"},\"image\":{\"@id\":\"https:\/\/epd.sabah.gov.my\/virsopv2\/#\/schema\/logo\/image\/\"}}]}<\/script>\r\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Site Preparation: Hydraulic \u2013\u00a02.0 Processing and Stockpile Area - Interactive Isometric Map","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation-hydraulic-pontoon\/site-preparation-hydraulic-2-0-processing-and-stockpile-area\/","og_locale":"en_US","og_type":"article","og_title":"Site Preparation: Hydraulic \u2013\u00a02.0 Processing and Stockpile Area - Interactive Isometric Map","og_url":"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation-hydraulic-pontoon\/site-preparation-hydraulic-2-0-processing-and-stockpile-area\/","og_site_name":"Interactive Isometric Map","article_modified_time":"2023-07-05T08:45:38+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation-hydraulic-pontoon\/site-preparation-hydraulic-2-0-processing-and-stockpile-area\/","url":"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation-hydraulic-pontoon\/site-preparation-hydraulic-2-0-processing-and-stockpile-area\/","name":"Site Preparation: Hydraulic \u2013\u00a02.0 Processing and Stockpile Area - Interactive Isometric Map","isPartOf":{"@id":"https:\/\/epd.sabah.gov.my\/virsopv2\/#website"},"datePublished":"2023-07-03T09:51:44+00:00","dateModified":"2023-07-05T08:45:38+00:00","breadcrumb":{"@id":"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation-hydraulic-pontoon\/site-preparation-hydraulic-2-0-processing-and-stockpile-area\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation-hydraulic-pontoon\/site-preparation-hydraulic-2-0-processing-and-stockpile-area\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation-hydraulic-pontoon\/site-preparation-hydraulic-2-0-processing-and-stockpile-area\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/epd.sabah.gov.my\/virsopv2\/"},{"@type":"ListItem","position":2,"name":"Site Preparation","item":"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/"},{"@type":"ListItem","position":3,"name":"Hydraulic (Pontoon)","item":"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation-hydraulic-pontoon\/"},{"@type":"ListItem","position":4,"name":"Site Preparation: Hydraulic \u2013\u00a02.0 Processing and Stockpile Area"}]},{"@type":"WebSite","@id":"https:\/\/epd.sabah.gov.my\/virsopv2\/#website","url":"https:\/\/epd.sabah.gov.my\/virsopv2\/","name":"EPD Interactive SOP","description":"Environmental Protection Department Sabah","publisher":{"@id":"https:\/\/epd.sabah.gov.my\/virsopv2\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/epd.sabah.gov.my\/virsopv2\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/epd.sabah.gov.my\/virsopv2\/#organization","name":"Environment Protection Department","url":"https:\/\/epd.sabah.gov.my\/virsopv2\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/epd.sabah.gov.my\/virsopv2\/#\/schema\/logo\/image\/","url":"http:\/\/localhost\/virsopv2\/wp-content\/uploads\/2022\/10\/cropped-epd-logo.jpeg","contentUrl":"http:\/\/localhost\/virsopv2\/wp-content\/uploads\/2022\/10\/cropped-epd-logo.jpeg","width":512,"height":512,"caption":"Environment Protection Department"},"image":{"@id":"https:\/\/epd.sabah.gov.my\/virsopv2\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/epd.sabah.gov.my\/virsopv2\/wp-json\/wp\/v2\/pages\/5351"}],"collection":[{"href":"https:\/\/epd.sabah.gov.my\/virsopv2\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/epd.sabah.gov.my\/virsopv2\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/epd.sabah.gov.my\/virsopv2\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/epd.sabah.gov.my\/virsopv2\/wp-json\/wp\/v2\/comments?post=5351"}],"version-history":[{"count":7,"href":"https:\/\/epd.sabah.gov.my\/virsopv2\/wp-json\/wp\/v2\/pages\/5351\/revisions"}],"predecessor-version":[{"id":5932,"href":"https:\/\/epd.sabah.gov.my\/virsopv2\/wp-json\/wp\/v2\/pages\/5351\/revisions\/5932"}],"up":[{"embeddable":true,"href":"https:\/\/epd.sabah.gov.my\/virsopv2\/wp-json\/wp\/v2\/pages\/5313"}],"wp:attachment":[{"href":"https:\/\/epd.sabah.gov.my\/virsopv2\/wp-json\/wp\/v2\/media?parent=5351"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}