{"id":5341,"date":"2023-07-03T17:43:41","date_gmt":"2023-07-03T09:43:41","guid":{"rendered":"http:\/\/localhost\/virsopv2\/?page_id=5341"},"modified":"2023-07-05T16:39:25","modified_gmt":"2023-07-05T08:39:25","slug":"site-preparation-mechanical-4-0-surface-runoff","status":"publish","type":"page","link":"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation\/site-preparation-mechanical-4-0-surface-runoff\/","title":{"rendered":"Site Preparation: Mechanical \u2013\u00a04.0 Surface Runoff"},"content":{"rendered":"\n\t<section class=\"section\" id=\"section_404583340\">\n\t\t<div class=\"bg section-bg fill bg-fill bg-loaded bg-loaded\" >\n\n\t\t\t\n\t\t\t\n\t\t\t\n\n\t\t<\/div>\n\n\t\t\n\n\t\t<div class=\"section-content relative\">\n\t\t\t\n\n<div class=\"row align-right\"  id=\"row-688845761\">\n\n\n\t<div id=\"col-1320367651\" class=\"col small-12 large-12\"  >\n\t\t\t\t<div class=\"col-inner\"  >\n\t\t\t\n\t\t\t\n\n<p style=\"text-align: right;\">\t\t\t<!-- Flexy Breadcrumb -->\r\n\t\t\t<div class=\"fbc fbc-page\">\r\n\r\n\t\t\t\t<!-- Breadcrumb wrapper -->\r\n\t\t\t\t<div class=\"fbc-wrap\">\r\n\r\n\t\t\t\t\t<!-- Ordered list-->\r\n\t\t\t\t\t<ol class=\"fbc-items\" itemscope itemtype=\"https:\/\/schema.org\/BreadcrumbList\">\r\n\t\t\t\t\t\t            <li itemprop=\"itemListElement\" itemscope itemtype=\"https:\/\/schema.org\/ListItem\">\r\n                <span itemprop=\"name\">\r\n                    <!-- Home Link -->\r\n                    <a itemprop=\"item\" href=\"https:\/\/epd.sabah.gov.my\/virsopv2\/\">\r\n                    \r\n                                                    <i class=\"fa fa-home\" aria-hidden=\"true\"><\/i>                    <\/a>\r\n                <\/span>\r\n                <meta itemprop=\"position\" content=\"1\" \/><!-- Meta Position-->\r\n             <\/li><li><span class=\"fbc-separator\">\/<\/span><\/li><li class=\"active\" itemprop=\"itemListElement\" itemscope itemtype=\"https:\/\/schema.org\/ListItem\"><span itemprop=\"name\" title=\"Site Preparation: Mechanical \u2013\u00a04.0 Surface Runoff\">Site Preparation: Mechanical \u2013\u00a04.0 Surface Runoff<\/span><meta itemprop=\"position\" content=\"2\" \/><\/li>\t\t\t\t\t<\/ol>\r\n\t\t\t\t\t<div class=\"clearfix\"><\/div>\r\n\t\t\t\t<\/div>\r\n\t\t\t<\/div>\r\n\t\t\t\n\n\t\t<\/div>\n\t\t\t\t\n<style>\n#col-1320367651 > .col-inner {\n  padding: 0px 11px 0px 0px;\n}\n<\/style>\n\t<\/div>\n\n\t\n\n<\/div>\n\n\t\t<\/div>\n\n\t\t\n<style>\n#section_404583340 {\n  padding-top: 30px;\n  padding-bottom: 30px;\n}\n#section_404583340 .ux-shape-divider--top svg {\n  height: 150px;\n  --divider-top-width: 100%;\n}\n#section_404583340 .ux-shape-divider--bottom svg {\n  height: 150px;\n  --divider-width: 100%;\n}\n<\/style>\n\t<\/section>\n\t\n\t<section class=\"section\" id=\"section_572794890\">\n\t\t<div class=\"bg section-bg fill bg-fill bg-loaded bg-loaded\" >\n\n\t\t\t\n\t\t\t\n\t\t\t\n\n\t\t<\/div>\n\n\t\t\n\n\t\t<div class=\"section-content relative\">\n\t\t\t\n\n\t<div id=\"text-6180189\" class=\"text t-justify\">\n\t\t\n\n<h1 class=\"uppercase\" style=\"text-align: center;\"><span style=\"font-size: 120%; color: #446084;\">CONTROL OF surface runoff<\/span><\/h1>\n<p>&nbsp;<\/p>\n<p><strong>Any bare area within the processing site and temporary occupation sites such as workers quarters and site office is prone to detachment of soil and associated with weathering agents i.e. rain and wind may aggravate the impacts of soil erosion. Detached soil is carried by surface runoff and deteriorates the nearest receiving waterbodies i.e. any established drainage system at the temporary occupation site and river by increasing turbidity levels and total suspended solids. The temporary drainage system and erosion and sediment control structures should be provided to control and facilitate effective retention and discharge of sediment runoff.<\/strong><\/p>\n\t\t\t<\/div>\n\t\n<div class=\"row\"  id=\"row-407193632\">\n\n\n\t<div id=\"col-270927603\" class=\"col medium-2 small-12 large-2\"  >\n\t\t\t\t<div class=\"col-inner\"  >\n\t\t\t\n\t\t\t\n\n<h3>Target:<\/h3>\n\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\n\t\n\n\t<div id=\"col-1871158244\" class=\"col medium-10 small-12 large-10\"  >\n\t\t\t\t<div class=\"col-inner\"  >\n\t\t\t\n\t\t\t\n\n<p>Protection of river or waterway from sediment derived from the Project activity.<\/p>\n\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\n\t\n\n<\/div>\n<div class=\"is-divider divider clearfix\" style=\"max-width:100%;\"><\/div>\n<div class=\"row\"  id=\"row-886975696\">\n\n\n\t<div id=\"col-807018717\" class=\"col sop_div medium-2 small-12 large-2\"  >\n\t\t\t\t<div class=\"col-inner\"  >\n\t\t\t\n\t\t\t\n\n\t<div id=\"text-473555197\" class=\"text\">\n\t\t\n\n<h3>Standard Operating Procedures<\/h3>\n\t\t\n<style>\n#text-473555197 {\n  font-size: 1.2rem;\n}\n<\/style>\n\t<\/div>\n\t\n\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\n\t\n\n\t<div id=\"col-617860865\" class=\"col medium-10 small-12 large-10\"  >\n\t\t\t\t<div class=\"col-inner\"  >\n\t\t\t\n\t\t\t\n\n\t<div id=\"text-777015269\" class=\"text t-justify\">\n\t\t\n\n<p><strong>4.1<\/strong> Refer to the EIA, AEC, latest mitigation measures map approved by the EPD, and ESCP (if any). Check and identify:<\/p>\n<ol>\n<li style=\"list-style-type: none;\">\n<ol>\n<li>Runoff management and sediment control facilities e., temporary earth drains, check dams, silt fences, silt traps, earth bund, and sediment basins etc., to be provided at the site.<\/li>\n<li>Specifications and locations in the&nbsp; provision of runoff management and sediment control facilities.<\/li>\n<\/ol>\n<\/li>\n<\/ol>\n<p>\n\t\t\n<style>\n#text-777015269 {\n  font-size: 0.95rem;\n}\n<\/style>\n\t<\/div>\n\t\n<div class=\"is-divider divider clearfix\" style=\"max-width:100%;\"><\/div>\n\n\t<div id=\"text-3526268740\" class=\"text t-justify\">\n\t\t\n\n<\/p>\n<p><strong>4.2 <\/strong>Construct the runoff management and sediment control facilities in accordance with the location and specifications in the EIA, AEC, and ESCP (if any).<\/p>\n\t\t\n<style>\n#text-3526268740 {\n  font-size: 0.95rem;\n}\n<\/style>\n\t<\/div>\n\t\n<div class=\"row\"  id=\"row-1061178771\">\n\n\n\t<div id=\"col-2071234442\" class=\"col small-12 large-12\"  >\n\t\t\t\t<div class=\"col-inner\"  >\n\t\t\t\n\t\t\t\n\n\t<div class=\"box has-hover   has-hover box-text-bottom\" >\n\n\t\t<div class=\"box-image\" style=\"width:70%;\">\n\t\t\t\t\t\t<div class=\"\" >\n\t\t\t\t<img width=\"958\" height=\"639\" src=\"https:\/\/epd.sabah.gov.my\/virsopv2\/wp-content\/uploads\/2023\/05\/27.jpg\" class=\"attachment- size-\" alt=\"\" decoding=\"async\" loading=\"lazy\" srcset=\"https:\/\/epd.sabah.gov.my\/virsopv2\/wp-content\/uploads\/2023\/05\/27.jpg 958w, https:\/\/epd.sabah.gov.my\/virsopv2\/wp-content\/uploads\/2023\/05\/27-600x400.jpg 600w, https:\/\/epd.sabah.gov.my\/virsopv2\/wp-content\/uploads\/2023\/05\/27-768x512.jpg 768w\" sizes=\"(max-width: 958px) 100vw, 958px\" \/>\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\n\t\t<div class=\"box-text text-center\" >\n\t\t\t<div class=\"box-text-inner\">\n\t\t\t\t\n\n\t<div id=\"text-611247131\" class=\"text\">\n\t\t\n\n<p><strong>Plate 10: <\/strong>Sedimentation pond (pointed)<\/p>\n\t\t\n<style>\n#text-611247131 {\n  font-size: 0.9rem;\n}\n<\/style>\n\t<\/div>\n\t\n\n\t\t\t<\/div>\n\t\t<\/div>\n\t<\/div>\n\t\n\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\n\t\n\n\t<div id=\"col-146078679\" class=\"col small-12 large-12\"  >\n\t\t\t\t<div class=\"col-inner\"  >\n\t\t\t\n\t\t\t\n\n\t<div class=\"box has-hover   has-hover box-text-bottom\" >\n\n\t\t<div class=\"box-image\" style=\"width:80%;\">\n\t\t\t\t\t\t<div class=\"\" >\n\t\t\t\t<img width=\"1053\" height=\"471\" src=\"https:\/\/epd.sabah.gov.my\/virsopv2\/wp-content\/uploads\/2023\/05\/29.jpg\" class=\"attachment- size-\" alt=\"\" decoding=\"async\" loading=\"lazy\" srcset=\"https:\/\/epd.sabah.gov.my\/virsopv2\/wp-content\/uploads\/2023\/05\/29.jpg 1053w, https:\/\/epd.sabah.gov.my\/virsopv2\/wp-content\/uploads\/2023\/05\/29-800x358.jpg 800w, https:\/\/epd.sabah.gov.my\/virsopv2\/wp-content\/uploads\/2023\/05\/29-768x344.jpg 768w\" sizes=\"(max-width: 1053px) 100vw, 1053px\" \/>\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\n\t\t<div class=\"box-text text-center\" >\n\t\t\t<div class=\"box-text-inner\">\n\t\t\t\t\n\n\t<div id=\"text-3842025810\" class=\"text\">\n\t\t\n\n<p><strong>Figure 9: <\/strong>Plan view of sediment control facilities with cross-sections.<\/p>\n\t\t\n<style>\n#text-3842025810 {\n  font-size: 0.9rem;\n}\n<\/style>\n\t<\/div>\n\t\n\n\t\t\t<\/div>\n\t\t<\/div>\n\t<\/div>\n\t\n\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\n\t\n\n<\/div>\n\t<div id=\"text-989588010\" class=\"text t-justify\">\n\t\t\n\n<p><strong>4.3<\/strong> Prepare a maintenance programme, including plans for removal and disposal of unwanted sediments and repair of damaged runoff management and sediment control facilities.<\/p>\n<p>\n\t\t\n<style>\n#text-989588010 {\n  font-size: 0.95rem;\n}\n<\/style>\n\t<\/div>\n\t\n<div class=\"is-divider divider clearfix\" style=\"max-width:100%;\"><\/div>\n\n\t<div id=\"text-2499618306\" class=\"text t-justify\">\n\t\t\n\n<\/p>\n<p><strong>4.4 <\/strong>Conduct patrolling activities at the project site to check the condition of the runoff management and sediment control facilities at processing, workers quarters and stockpile As a best management practice, cover stockpiles with canvas or other suitable materials, whenever possible.<\/p>\n<p>\n\t\t\n<style>\n#text-2499618306 {\n  font-size: 0.95rem;\n}\n<\/style>\n\t<\/div>\n\t\n<div class=\"is-divider divider clearfix\" style=\"max-width:100%;\"><\/div>\n\n\t<div id=\"text-3813579359\" class=\"text t-justify\">\n\t\t\n\n<\/p>\n<p><strong>4.5 <\/strong>Conduct maintenance at regular intervals e. bi-weekly or monthly with increased frequency after each rain event.<\/p>\n<p>\n\t\t\n<style>\n#text-3813579359 {\n  font-size: 0.95rem;\n}\n<\/style>\n\t<\/div>\n\t\n<div class=\"is-divider divider clearfix\" style=\"max-width:100%;\"><\/div>\n\n\t<div id=\"text-4060129807\" class=\"text t-justify\">\n\t\t\n\n<\/p>\n<p><strong>4.6 <\/strong>Place excavated sediment from maintenance activities away from riverbanks, waterways, and riparian Compact excavated sediment, provide an earth bund around the sediment to prevent it from being washed away by surface runoff, and divert runoff to a silt trap or sedimentation pond.<\/p>\n<p>\n\t\t\n<style>\n#text-4060129807 {\n  font-size: 0.95rem;\n}\n<\/style>\n\t<\/div>\n\t\n<div class=\"is-divider divider clearfix\" style=\"max-width:100%;\"><\/div>\n\n\t<div id=\"text-314279272\" class=\"text t-justify\">\n\t\t\n\n<\/p>\n<p><strong>4.7 <\/strong>Keep records (with photographs) for any maintenance of the runoff management and sediment control facilities.<\/p>\n<p>\n\t\t\n<style>\n#text-314279272 {\n  font-size: 0.95rem;\n}\n<\/style>\n\t<\/div>\n\t\n<div class=\"is-divider divider clearfix\" style=\"max-width:100%;\"><\/div>\n\n\t<div id=\"text-1949041406\" class=\"text t-justify\">\n\t\t\n\n<\/p>\n<p><strong>4.8 <\/strong>Consider conducting modifications to the runoff management and sediment control facilities in the event of:<\/p>\n<ol>\n<li style=\"list-style-type: none;\">\n<ol>\n<li>Off-site drainage impact (e.g., reduction in flow rate of off- site drainage due to sediment-laden runoff from site)<\/li>\n<li>Repeated failure of the constructed control facilities (usually indicated with murky water discharges)<\/li>\n<li>Changes to on-site conditions.<\/li>\n<\/ol>\n<\/li>\n<\/ol>\n<p>\n\t\t\n<style>\n#text-1949041406 {\n  font-size: 0.95rem;\n}\n<\/style>\n\t<\/div>\n\t\n<div class=\"is-divider divider clearfix\" style=\"max-width:100%;\"><\/div>\n\n\t<div id=\"text-3588086199\" class=\"text t-justify\">\n\t\t\n\n<\/p>\n<p>Conduct the modification after obtaining feedback from EPD.<\/p>\n<p><strong>4.9 <\/strong>Rehabilitate all exposed areas with suitable vegetation.<\/p>\n<p>\n\t\t\n<style>\n#text-3588086199 {\n  font-size: 0.95rem;\n}\n<\/style>\n\t<\/div>\n\t\n<div class=\"is-divider divider clearfix\" style=\"max-width:100%;\"><\/div>\n\n<\/p>\n\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\n\t\n\n<\/div>\n\n\t\t<\/div>\n\n\t\t\n<style>\n#section_572794890 {\n  padding-top: 30px;\n  padding-bottom: 30px;\n}\n#section_572794890 .ux-shape-divider--top svg {\n  height: 150px;\n  --divider-top-width: 100%;\n}\n#section_572794890 .ux-shape-divider--bottom svg {\n  height: 150px;\n  --divider-width: 100%;\n}\n<\/style>\n\t<\/section>\n\t\n\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":0,"parent":4791,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v21.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\r\n<title>Site Preparation: Mechanical \u2013\u00a04.0 Surface Runoff - Interactive Isometric Map<\/title>\r\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\r\n<link rel=\"canonical\" href=\"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation\/site-preparation-mechanical-4-0-surface-runoff\/\" \/>\r\n<meta property=\"og:locale\" content=\"en_US\" \/>\r\n<meta property=\"og:type\" content=\"article\" \/>\r\n<meta property=\"og:title\" content=\"Site Preparation: Mechanical \u2013\u00a04.0 Surface Runoff - Interactive Isometric Map\" \/>\r\n<meta property=\"og:url\" content=\"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation\/site-preparation-mechanical-4-0-surface-runoff\/\" \/>\r\n<meta property=\"og:site_name\" content=\"Interactive Isometric Map\" \/>\r\n<meta property=\"article:modified_time\" content=\"2023-07-05T08:39:25+00:00\" \/>\r\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\r\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\r\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation\/site-preparation-mechanical-4-0-surface-runoff\/\",\"url\":\"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation\/site-preparation-mechanical-4-0-surface-runoff\/\",\"name\":\"Site Preparation: Mechanical \u2013\u00a04.0 Surface Runoff - Interactive Isometric Map\",\"isPartOf\":{\"@id\":\"https:\/\/epd.sabah.gov.my\/virsopv2\/#website\"},\"datePublished\":\"2023-07-03T09:43:41+00:00\",\"dateModified\":\"2023-07-05T08:39:25+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation\/site-preparation-mechanical-4-0-surface-runoff\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation\/site-preparation-mechanical-4-0-surface-runoff\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation\/site-preparation-mechanical-4-0-surface-runoff\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/epd.sabah.gov.my\/virsopv2\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Site Preparation\",\"item\":\"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Mechanical (Excavator\/Barge)\",\"item\":\"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Site Preparation: Mechanical \u2013\u00a04.0 Surface Runoff\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/epd.sabah.gov.my\/virsopv2\/#website\",\"url\":\"https:\/\/epd.sabah.gov.my\/virsopv2\/\",\"name\":\"EPD Interactive SOP\",\"description\":\"Environmental Protection Department Sabah\",\"publisher\":{\"@id\":\"https:\/\/epd.sabah.gov.my\/virsopv2\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/epd.sabah.gov.my\/virsopv2\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/epd.sabah.gov.my\/virsopv2\/#organization\",\"name\":\"Environment Protection Department\",\"url\":\"https:\/\/epd.sabah.gov.my\/virsopv2\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/epd.sabah.gov.my\/virsopv2\/#\/schema\/logo\/image\/\",\"url\":\"http:\/\/localhost\/virsopv2\/wp-content\/uploads\/2022\/10\/cropped-epd-logo.jpeg\",\"contentUrl\":\"http:\/\/localhost\/virsopv2\/wp-content\/uploads\/2022\/10\/cropped-epd-logo.jpeg\",\"width\":512,\"height\":512,\"caption\":\"Environment Protection Department\"},\"image\":{\"@id\":\"https:\/\/epd.sabah.gov.my\/virsopv2\/#\/schema\/logo\/image\/\"}}]}<\/script>\r\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Site Preparation: Mechanical \u2013\u00a04.0 Surface Runoff - Interactive Isometric Map","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation\/site-preparation-mechanical-4-0-surface-runoff\/","og_locale":"en_US","og_type":"article","og_title":"Site Preparation: Mechanical \u2013\u00a04.0 Surface Runoff - Interactive Isometric Map","og_url":"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation\/site-preparation-mechanical-4-0-surface-runoff\/","og_site_name":"Interactive Isometric Map","article_modified_time":"2023-07-05T08:39:25+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation\/site-preparation-mechanical-4-0-surface-runoff\/","url":"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation\/site-preparation-mechanical-4-0-surface-runoff\/","name":"Site Preparation: Mechanical \u2013\u00a04.0 Surface Runoff - Interactive Isometric Map","isPartOf":{"@id":"https:\/\/epd.sabah.gov.my\/virsopv2\/#website"},"datePublished":"2023-07-03T09:43:41+00:00","dateModified":"2023-07-05T08:39:25+00:00","breadcrumb":{"@id":"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation\/site-preparation-mechanical-4-0-surface-runoff\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation\/site-preparation-mechanical-4-0-surface-runoff\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation\/site-preparation-mechanical-4-0-surface-runoff\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/epd.sabah.gov.my\/virsopv2\/"},{"@type":"ListItem","position":2,"name":"Site Preparation","item":"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/"},{"@type":"ListItem","position":3,"name":"Mechanical (Excavator\/Barge)","item":"https:\/\/epd.sabah.gov.my\/virsopv2\/division-site-preparation\/site-preparation\/"},{"@type":"ListItem","position":4,"name":"Site Preparation: Mechanical \u2013\u00a04.0 Surface Runoff"}]},{"@type":"WebSite","@id":"https:\/\/epd.sabah.gov.my\/virsopv2\/#website","url":"https:\/\/epd.sabah.gov.my\/virsopv2\/","name":"EPD Interactive SOP","description":"Environmental Protection Department Sabah","publisher":{"@id":"https:\/\/epd.sabah.gov.my\/virsopv2\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/epd.sabah.gov.my\/virsopv2\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/epd.sabah.gov.my\/virsopv2\/#organization","name":"Environment Protection Department","url":"https:\/\/epd.sabah.gov.my\/virsopv2\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/epd.sabah.gov.my\/virsopv2\/#\/schema\/logo\/image\/","url":"http:\/\/localhost\/virsopv2\/wp-content\/uploads\/2022\/10\/cropped-epd-logo.jpeg","contentUrl":"http:\/\/localhost\/virsopv2\/wp-content\/uploads\/2022\/10\/cropped-epd-logo.jpeg","width":512,"height":512,"caption":"Environment Protection Department"},"image":{"@id":"https:\/\/epd.sabah.gov.my\/virsopv2\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/epd.sabah.gov.my\/virsopv2\/wp-json\/wp\/v2\/pages\/5341"}],"collection":[{"href":"https:\/\/epd.sabah.gov.my\/virsopv2\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/epd.sabah.gov.my\/virsopv2\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/epd.sabah.gov.my\/virsopv2\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/epd.sabah.gov.my\/virsopv2\/wp-json\/wp\/v2\/comments?post=5341"}],"version-history":[{"count":9,"href":"https:\/\/epd.sabah.gov.my\/virsopv2\/wp-json\/wp\/v2\/pages\/5341\/revisions"}],"predecessor-version":[{"id":5923,"href":"https:\/\/epd.sabah.gov.my\/virsopv2\/wp-json\/wp\/v2\/pages\/5341\/revisions\/5923"}],"up":[{"embeddable":true,"href":"https:\/\/epd.sabah.gov.my\/virsopv2\/wp-json\/wp\/v2\/pages\/4791"}],"wp:attachment":[{"href":"https:\/\/epd.sabah.gov.my\/virsopv2\/wp-json\/wp\/v2\/media?parent=5341"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}