{"id":453,"date":"2022-10-05T22:06:11","date_gmt":"2022-10-05T14:06:11","guid":{"rendered":"https:\/\/epd.sabah.gov.my\/virsop\/?page_id=453"},"modified":"2022-12-09T16:04:06","modified_gmt":"2022-12-09T08:04:06","slug":"sop-environmental-condition-slope-stabilisation","status":"publish","type":"page","link":"https:\/\/epd.sabah.gov.my\/virsop\/overview\/sop-environmental-condition-slope-stabilisation\/","title":{"rendered":"4. Environmental Condition: Slope Stabilisation"},"content":{"rendered":"\n\t<section class=\"section\" id=\"section_1748764735\">\n\t\t<div class=\"bg section-bg fill bg-fill  bg-loaded\" >\n\n\t\t\t\n\t\t\t\n\t\t\t\n\n\t\t<\/div>\n\n\t\t\n\n\t\t<div class=\"section-content relative\">\n\t\t\t\n\n<div class=\"row\"  id=\"row-913111006\">\n\n\n\t<div id=\"col-2048478205\" class=\"col medium-2 small-12 large-2\"  >\n\t\t\t\t<div class=\"col-inner\"  >\n\t\t\t\n\t\t\t\n\n<a href=\"https:\/\/epd.sabah.gov.my\/virsop\/overview\/\" target=\"_self\" class=\"button primary is-small\"  style=\"border-radius:10px;\">\n  <i class=\"icon-angle-left\" ><\/i>  <span>back<\/span>\n  <\/a>\n\n\n\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\n\t\n\n\t<div id=\"col-1119634387\" class=\"col medium-10 small-12 large-10\"  >\n\t\t\t\t<div class=\"col-inner\"  >\n\t\t\t\n\t\t\t\n\n<h5 style=\"text-align: right;\"><a href=\"https:\/\/epd.sabah.gov.my\/virsop\/\">HOME<\/a> \/\u00a0 <a href=\"https:\/\/epd.sabah.gov.my\/virsop\/overview\/\">SOP<\/a> \/ 4. ENVIRONMENTAL CONDITION: SLOPE STABILISATION<\/h5>\n\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\n\t\n\n<\/div>\n\n\t\t<\/div>\n\n\t\t\n<style>\n#section_1748764735 {\n  padding-top: 30px;\n  padding-bottom: 30px;\n}\n#section_1748764735 .ux-shape-divider--top svg {\n  height: 150px;\n  --divider-top-width: 100%;\n}\n#section_1748764735 .ux-shape-divider--bottom svg {\n  height: 150px;\n  --divider-width: 100%;\n}\n<\/style>\n\t<\/section>\n\t\n\t<section class=\"section\" id=\"section_657701331\">\n\t\t<div class=\"bg section-bg fill bg-fill  bg-loaded\" >\n\n\t\t\t\n\t\t\t\n\t\t\t\n\n\t\t<\/div>\n\n\t\t\n\n\t\t<div class=\"section-content relative\">\n\t\t\t\n\n<div class=\"row\"  id=\"row-1298307582\">\n\n\n\t<div id=\"col-430857936\" class=\"col small-12 large-12\"  >\n\t\t\t\t<div class=\"col-inner text-center\"  >\n\t\t\t\n\t\t\t\n\n<p style=\"text-align: left;\"><strong>Slope alteration by cutting or filling embankments can trigger slope failures, especially in the event of a major rainfall and\/or without applying proper slope protection measures and slope drainage. Unplanned or improper slope construction methods may cause slope failures or landslides to occur within the site or in neighbouring areas.<\/strong><\/p>\n<div id=\"row-832004231\" class=\"row\" style=\"text-align: left;\">\n<div id=\"col-1054278601\" class=\"col medium-4 small-12 large-4\">\n<div class=\"col-inner\">\n<p><strong>Target<\/strong><\/p>\n<\/div>\n<\/div>\n<div id=\"col-257736609\" class=\"col medium-8 small-12 large-8\">\n<div class=\"col-inner\">\n<p><strong>Control of slope cutting activities to mitigate erosion and landslides.<\/strong><\/p>\n<\/div>\n<\/div>\n<\/div>\n<div id=\"row-1090070\" class=\"row\" style=\"text-align: left;\">\n<div id=\"col-1371522708\" class=\"col small-12 large-12\">\n<div class=\"col-inner\">\n<p><strong>Standard Operating Procedures <\/strong><\/p>\n<p><strong>4.1 Refer to the EIA\/PMM and AEC\/MD for slope stabilisation measures. Check and identify:<\/strong><\/p>\n<p style=\"margin-left: 2.5em;\"><strong>i. Buffer requirements.<\/strong><\/p>\n<p style=\"margin-left: 2.5em;\"><strong>ii. The best engineering practices for slope stabilisation approved by relevant Local Authorities (examples shown in Plates 14 \u2013 16).<\/strong><\/p>\n<p style=\"margin-left: 2.5em;\"><strong>iii. Location, method and sequence for implementing slope protection measures such as slope cutting sequence, runoff management and sediment control facilities i.e., cascade drain, toe drain, berm drain, etc.<\/strong><\/p>\n<p><strong>4.2 Implement slope stabilisation measures as per the EIA\/PMM and AEC\/MD.<\/strong><\/p>\n<p><strong>4.3 Minimise removal of existing vegetation to aid slope and soil zone stabilisation.<\/strong><\/p>\n<p><strong>4.4 Commence slope cutting immediately after the area is cleared.<\/strong><\/p>\n<p><strong>4.5 Conduct slope cutting in stages and in a controlled manner.<\/strong><\/p>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"row\"  id=\"row-1745983941\">\n\n\n\t<div id=\"col-537467781\" class=\"col small-12 large-12\"  >\n\t\t\t\t<div class=\"col-inner text-center\"  >\n\t\t\t\n\t\t\t\n\n\t<div class=\"img has-hover x md-x lg-x y md-y lg-y\" id=\"image_2034937854\">\n\t\t<a class=\"image-lightbox lightbox-gallery\" title=\"\" href=\"https:\/\/epd.sabah.gov.my\/virsop\/wp-content\/uploads\/2022\/10\/20.png\">\t\t\t\t\t\t<div class=\"img-inner dark\" >\n\t\t\t<img width=\"562\" height=\"425\" src=\"https:\/\/epd.sabah.gov.my\/virsop\/wp-content\/uploads\/2022\/10\/20.png\" class=\"attachment-large size-large\" alt=\"\" decoding=\"async\" loading=\"lazy\" srcset=\"https:\/\/epd.sabah.gov.my\/virsop\/wp-content\/uploads\/2022\/10\/20.png 562w, https:\/\/epd.sabah.gov.my\/virsop\/wp-content\/uploads\/2022\/10\/20-529x400.png 529w\" sizes=\"(max-width: 562px) 100vw, 562px\" \/>\t\t\t\t\t\t\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/a>\t\t\n<style>\n#image_2034937854 {\n  width: 100%;\n}\n@media (min-width:550px) {\n  #image_2034937854 {\n    width: 70%;\n  }\n}\n<\/style>\n\t<\/div>\n\t\n\n<p style=\"text-align: center;\"><strong>Plate 14: Example of soil nail wall for slope stabilisation.<\/strong><\/p>\n\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\n\t\n\n<\/div>\n<div class=\"row\"  id=\"row-2049178173\">\n\n\n\t<div id=\"col-655531418\" class=\"col small-12 large-12\"  >\n\t\t\t\t<div class=\"col-inner text-center\"  >\n\t\t\t\n\t\t\t\n\n\t<div class=\"img has-hover x md-x lg-x y md-y lg-y\" id=\"image_1543502068\">\n\t\t<a class=\"image-lightbox lightbox-gallery\" title=\"\" href=\"https:\/\/epd.sabah.gov.my\/virsop\/wp-content\/uploads\/2022\/10\/21.png\">\t\t\t\t\t\t<div class=\"img-inner dark\" >\n\t\t\t<img width=\"561\" height=\"425\" src=\"https:\/\/epd.sabah.gov.my\/virsop\/wp-content\/uploads\/2022\/10\/21.png\" class=\"attachment-large size-large\" alt=\"\" decoding=\"async\" loading=\"lazy\" srcset=\"https:\/\/epd.sabah.gov.my\/virsop\/wp-content\/uploads\/2022\/10\/21.png 561w, https:\/\/epd.sabah.gov.my\/virsop\/wp-content\/uploads\/2022\/10\/21-528x400.png 528w\" sizes=\"(max-width: 561px) 100vw, 561px\" \/>\t\t\t\t\t\t\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/a>\t\t\n<style>\n#image_1543502068 {\n  width: 100%;\n}\n@media (min-width:550px) {\n  #image_1543502068 {\n    width: 70%;\n  }\n}\n<\/style>\n\t<\/div>\n\t\n\n<p><strong>Plate 15: Example of Nehemiah retaining wall for slope stabilisation.<\/strong><\/p>\n\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\n\t\n\n<\/div>\n<div class=\"row\"  id=\"row-605403735\">\n\n\n\t<div id=\"col-1168861261\" class=\"col small-12 large-12\"  >\n\t\t\t\t<div class=\"col-inner text-center\"  >\n\t\t\t\n\t\t\t\n\n\t<div class=\"img has-hover x md-x lg-x y md-y lg-y\" id=\"image_626370426\">\n\t\t<a class=\"image-lightbox lightbox-gallery\" title=\"\" href=\"https:\/\/epd.sabah.gov.my\/virsop\/wp-content\/uploads\/2022\/10\/22.png\">\t\t\t\t\t\t<div class=\"img-inner dark\" >\n\t\t\t<img width=\"514\" height=\"388\" src=\"https:\/\/epd.sabah.gov.my\/virsop\/wp-content\/uploads\/2022\/10\/22.png\" class=\"attachment-large size-large\" alt=\"\" decoding=\"async\" loading=\"lazy\" \/>\t\t\t\t\t\t\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/a>\t\t\n<style>\n#image_626370426 {\n  width: 100%;\n}\n@media (min-width:550px) {\n  #image_626370426 {\n    width: 70%;\n  }\n}\n<\/style>\n\t<\/div>\n\t\n\n<p><strong>Plate 16: Example of terracing and cover crops for slope stabilisation.<\/strong><\/p>\n\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\n\t\n\n<\/div>\n<p><strong>4.6 Apply rock dissipater at the end point or at the toe end of the incomplete adjoining permanent drainage lines constructed along sloping areas.<\/strong><\/p>\n<div class=\"row\"  id=\"row-1413411806\">\n\n\n\t<div id=\"col-1398886605\" class=\"col small-12 large-12\"  >\n\t\t\t\t<div class=\"col-inner text-center\"  >\n\t\t\t\n\t\t\t\n\n\t<div class=\"img has-hover x md-x lg-x y md-y lg-y\" id=\"image_928379692\">\n\t\t<a class=\"image-lightbox lightbox-gallery\" title=\"\" href=\"https:\/\/epd.sabah.gov.my\/virsop\/wp-content\/uploads\/2022\/10\/23.png\">\t\t\t\t\t\t<div class=\"img-inner dark\" >\n\t\t\t<img width=\"503\" height=\"374\" src=\"https:\/\/epd.sabah.gov.my\/virsop\/wp-content\/uploads\/2022\/10\/23.png\" class=\"attachment-large size-large\" alt=\"\" decoding=\"async\" loading=\"lazy\" \/>\t\t\t\t\t\t\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/a>\t\t\n<style>\n#image_928379692 {\n  width: 100%;\n}\n@media (min-width:550px) {\n  #image_928379692 {\n    width: 70%;\n  }\n}\n<\/style>\n\t<\/div>\n\t\n\n<p style=\"text-align: center;\"><strong>Plate 17: Example of rock dissipater at the end point of drainage.<\/strong><\/p>\n<p style=\"text-align: center;\"><strong>Source: Guidelines on Land Disturbing Pollution Prevention and Mitigation Measures, 2017 (Appendix B)<\/strong><\/p>\n\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\n\t\n\n<\/div>\n<div class=\"box has-hover   has-hover box-text-bottom\" style=\"text-align: left;\">\n<div class=\"box-image\">\n<div>\u00a0<\/div>\n<\/div>\n<\/div>\n<div id=\"row-1073943610\" class=\"row\">\n<div id=\"col-1163446381\" class=\"col small-12 large-12\">\n<div class=\"col-inner\">\n<p style=\"text-align: left;\"><strong>4.7 No stockpiling materials on slopes, slope crests or any probable locations susceptible to landslides or endangerment of the public or adjacent properties.<\/strong><\/p>\n<p style=\"text-align: left;\"><strong>4.8 Appoint a geotechnical engineer and professional geologist to jointly draw up the slope rehabilitation and stability monitoring plan (if such requirement is stated in the AEC\/MD), even after the project has commenced. Refer to Appendix 2 for the general content of the slope rehabilitation and stability monitoring plan.<\/strong><\/p>\n<p style=\"text-align: left;\"><strong>4.9 Submit slope rehabilitation and stability monitoring plan to JMG for approval.<\/strong><\/p>\n<p style=\"text-align: left;\"><strong>4.10 Submit approved slope rehabilitation and stability monitoring plan to the EPD.<\/strong><\/p>\n<p style=\"text-align: left;\"><strong>4.11 In addition, conduct the following steps for stabilised slopes.<\/strong><\/p>\n<p style=\"text-align: left; margin-left: 2.5em;\"><strong>i. Refer to the slope maintenance programme and slope maintenance manual prepared by the Submitting Engineer.<\/strong><\/p>\n<p style=\"text-align: left; margin-left: 2.5em;\"><strong>ii. Conduct visual inspection of all stabilisation structures. Record any defects in the stabilisation structures or any undeveloped slopes adjacent to the cut slope. These include special structures, such as drains, to ensure slopes are stable.<\/strong><\/p>\n<p style=\"text-align: left; margin-left: 2.5em;\"><strong>iii. Install instruments, such as inclinometers and ground\/building settlement markers, to monitor slope movement, if specified in the slope maintenance programme.<\/strong><\/p>\n<p style=\"text-align: left; margin-left: 2.5em;\"><strong>iv. If there are signs of slope movement on RC stabilised structures, engage a geotechnical engineer and professional geologist to study the causes in detail, and take immediate action.<\/strong><\/p>\n<\/div>\n<\/div>\n<\/div>\n\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\n\t\n\n<\/div>\n\n\t\t<\/div>\n\n\t\t\n<style>\n#section_657701331 {\n  padding-top: 30px;\n  padding-bottom: 30px;\n  background-color: rgb(250, 250, 250);\n}\n#section_657701331 .ux-shape-divider--top svg {\n  height: 150px;\n  --divider-top-width: 100%;\n}\n#section_657701331 .ux-shape-divider--bottom svg {\n  height: 150px;\n  --divider-width: 100%;\n}\n<\/style>\n\t<\/section>\n\t\n\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":0,"parent":742,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v20.2.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\r\n<title>4. Environmental Condition: Slope Stabilisation - Interactive Isometric Map<\/title>\r\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\r\n<link rel=\"canonical\" href=\"https:\/\/epd.sabah.gov.my\/virsop\/overview\/sop-environmental-condition-slope-stabilisation\/\" \/>\r\n<meta property=\"og:locale\" content=\"en_US\" \/>\r\n<meta property=\"og:type\" content=\"article\" \/>\r\n<meta property=\"og:title\" content=\"4. Environmental Condition: Slope Stabilisation - Interactive Isometric Map\" \/>\r\n<meta property=\"og:url\" content=\"https:\/\/epd.sabah.gov.my\/virsop\/overview\/sop-environmental-condition-slope-stabilisation\/\" \/>\r\n<meta property=\"og:site_name\" content=\"Interactive Isometric Map\" \/>\r\n<meta property=\"article:modified_time\" content=\"2022-12-09T08:04:06+00:00\" \/>\r\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\r\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\r\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/epd.sabah.gov.my\/virsop\/overview\/sop-environmental-condition-slope-stabilisation\/\",\"url\":\"https:\/\/epd.sabah.gov.my\/virsop\/overview\/sop-environmental-condition-slope-stabilisation\/\",\"name\":\"4. Environmental Condition: Slope Stabilisation - Interactive Isometric Map\",\"isPartOf\":{\"@id\":\"https:\/\/epd.sabah.gov.my\/virsop\/#website\"},\"datePublished\":\"2022-10-05T14:06:11+00:00\",\"dateModified\":\"2022-12-09T08:04:06+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/epd.sabah.gov.my\/virsop\/overview\/sop-environmental-condition-slope-stabilisation\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/epd.sabah.gov.my\/virsop\/overview\/sop-environmental-condition-slope-stabilisation\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/epd.sabah.gov.my\/virsop\/overview\/sop-environmental-condition-slope-stabilisation\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/epd.sabah.gov.my\/virsop\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Overview\",\"item\":\"https:\/\/epd.sabah.gov.my\/virsop\/overview\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"4. Environmental Condition: Slope Stabilisation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/epd.sabah.gov.my\/virsop\/#website\",\"url\":\"https:\/\/epd.sabah.gov.my\/virsop\/\",\"name\":\"Interactive Isometric Map\",\"description\":\"Environmental Protection Department Sabah\",\"publisher\":{\"@id\":\"https:\/\/epd.sabah.gov.my\/virsop\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/epd.sabah.gov.my\/virsop\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/epd.sabah.gov.my\/virsop\/#organization\",\"name\":\"Environment Protection Department of Sabah\",\"url\":\"https:\/\/epd.sabah.gov.my\/virsop\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/epd.sabah.gov.my\/virsop\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/epd.sabah.gov.my\/virsop\/wp-content\/uploads\/2023\/03\/epd-logo.png\",\"contentUrl\":\"https:\/\/epd.sabah.gov.my\/virsop\/wp-content\/uploads\/2023\/03\/epd-logo.png\",\"width\":194,\"height\":161,\"caption\":\"Environment Protection Department of Sabah\"},\"image\":{\"@id\":\"https:\/\/epd.sabah.gov.my\/virsop\/#\/schema\/logo\/image\/\"}}]}<\/script>\r\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"4. Environmental Condition: Slope Stabilisation - Interactive Isometric Map","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/epd.sabah.gov.my\/virsop\/overview\/sop-environmental-condition-slope-stabilisation\/","og_locale":"en_US","og_type":"article","og_title":"4. Environmental Condition: Slope Stabilisation - Interactive Isometric Map","og_url":"https:\/\/epd.sabah.gov.my\/virsop\/overview\/sop-environmental-condition-slope-stabilisation\/","og_site_name":"Interactive Isometric Map","article_modified_time":"2022-12-09T08:04:06+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/epd.sabah.gov.my\/virsop\/overview\/sop-environmental-condition-slope-stabilisation\/","url":"https:\/\/epd.sabah.gov.my\/virsop\/overview\/sop-environmental-condition-slope-stabilisation\/","name":"4. Environmental Condition: Slope Stabilisation - Interactive Isometric Map","isPartOf":{"@id":"https:\/\/epd.sabah.gov.my\/virsop\/#website"},"datePublished":"2022-10-05T14:06:11+00:00","dateModified":"2022-12-09T08:04:06+00:00","breadcrumb":{"@id":"https:\/\/epd.sabah.gov.my\/virsop\/overview\/sop-environmental-condition-slope-stabilisation\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/epd.sabah.gov.my\/virsop\/overview\/sop-environmental-condition-slope-stabilisation\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/epd.sabah.gov.my\/virsop\/overview\/sop-environmental-condition-slope-stabilisation\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/epd.sabah.gov.my\/virsop\/"},{"@type":"ListItem","position":2,"name":"Overview","item":"https:\/\/epd.sabah.gov.my\/virsop\/overview\/"},{"@type":"ListItem","position":3,"name":"4. Environmental Condition: Slope Stabilisation"}]},{"@type":"WebSite","@id":"https:\/\/epd.sabah.gov.my\/virsop\/#website","url":"https:\/\/epd.sabah.gov.my\/virsop\/","name":"Interactive Isometric Map","description":"Environmental Protection Department Sabah","publisher":{"@id":"https:\/\/epd.sabah.gov.my\/virsop\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/epd.sabah.gov.my\/virsop\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/epd.sabah.gov.my\/virsop\/#organization","name":"Environment Protection Department of Sabah","url":"https:\/\/epd.sabah.gov.my\/virsop\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/epd.sabah.gov.my\/virsop\/#\/schema\/logo\/image\/","url":"https:\/\/epd.sabah.gov.my\/virsop\/wp-content\/uploads\/2023\/03\/epd-logo.png","contentUrl":"https:\/\/epd.sabah.gov.my\/virsop\/wp-content\/uploads\/2023\/03\/epd-logo.png","width":194,"height":161,"caption":"Environment Protection Department of Sabah"},"image":{"@id":"https:\/\/epd.sabah.gov.my\/virsop\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/epd.sabah.gov.my\/virsop\/wp-json\/wp\/v2\/pages\/453"}],"collection":[{"href":"https:\/\/epd.sabah.gov.my\/virsop\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/epd.sabah.gov.my\/virsop\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/epd.sabah.gov.my\/virsop\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/epd.sabah.gov.my\/virsop\/wp-json\/wp\/v2\/comments?post=453"}],"version-history":[{"count":0,"href":"https:\/\/epd.sabah.gov.my\/virsop\/wp-json\/wp\/v2\/pages\/453\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/epd.sabah.gov.my\/virsop\/wp-json\/wp\/v2\/pages\/742"}],"wp:attachment":[{"href":"https:\/\/epd.sabah.gov.my\/virsop\/wp-json\/wp\/v2\/media?parent=453"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}